Bongshai Engineering & Construction delivers comprehensive reinforced cement concrete (RCC) structural construction across Bangladesh. Equipped with computerized concrete batching plants, transit mixers, concrete boom pumps, and heavy tower cranes, our structural engineering team constructs durable, earthquake-resistant high-rise commercial office towers, industrial complexes, and mixed-use real estate projects.
Multi-storied cast-in-situ reinforced concrete structural frames incorporating heavy column layouts, transfer girders, and ductile seismic detailing per BNBC 2020 Zone 3 seismic criteria.
Advanced post-tensioned unbonded tendon slab technology allowing longer span distances between columns, reduced slab thickness, reduced building dead load, and crack-free floor performance.
Monolithic slip-formed concrete elevator shafts, emergency stair cores, and perimeter shear walls designed to absorb lateral wind forces and seismic ground motion.
Heavy machinery foundation slabs, vibration-free concrete floors, power troweled vacuum-dewatered concrete finishes, and hardener-embedded floor screeds for industrial facilities.
Multi-floor retail shopping centers featuring wide-span atrium voids, escalator cutouts, underground multi-level basement car parking rafts, and heavy utility basements.
High-density luxury apartment towers, housing society developments, green building certified residential units, acoustic floor insulation, and waterproofing membrane systems.
| Component Element | Standard Specification | Code Compliance & Quality Assurance |
|---|---|---|
| Structural Concrete Grade | C25 to C45 (25 MPa - 45 MPa Compressive Strength) | ASTM C39 7-Day & 28-Day Cube/Cylinder Tests |
| Deformed Steel Reinforcement | High Yield 500W / Grade 60 (420 MPa Min Yield) | BDS ISO 6935-2 / ASTM A615 Tensile Testing |
| Formwork Systems | Modular Steel Formwork & Marine Plywood Shutters | Deflection tolerance < L/360 per ACI 347 |
| Concrete Curing Standard | Continuous Ponding / Curing Compound Membrane | Minimum 28-Day Curing Protocol per BNBC 2020 |
Constructed the 20-storied 5-star hotel tower structure in Banani/Gulshan zone, Dhaka. Scope included deep bored piling foundation, 3-level basement raft foundation, post-tensioned floor slabs, shear wall core slipforming, and high-spec architectural RCC finish.
PT slabs significantly reduce floor-to-floor height requirements, eliminate beam drops to create larger clear headroom, allow longer spans between columns, and minimize concrete volume while preventing flexural slab cracking.
We conduct Schmidt Rebound Hammer testing (ASTM C805) and Ultrasonic Pulse Velocity (UPV) testing (ASTM C597) to non-destructively verify concrete uniformity, density, and compressive strength across high-stress vertical columns.